1. Responsibility of overall Routine test (like measurement of windingresistance, voltage ratio, short ckt impedance and load loss at 50% and 100% load, no load loss and no load current, insulation resistance, induced over-voltage withstand test or DVDF test, separate-source voltage withstand test, pressure test, vacuum test etc.) of Distribution Transformer up to 1 MVA. & work is underway to achieve success on the 10 MVA Power transformer which is under processing.
2. Responsible for inspection and report submission from Electricity Board.
3. Supervised Transformer’s installation project including new installations.
4. Inspected Electrical Systems and made upgrade and Repair recommendation.
5. Responsible for managing the cost of Production, ensuring that the plant Operates efficiently and that waste is minimized.
6. Responsible for managing of Production, ensuring that the plant Operates efficiently and that waste is minimized.
7. Design needs to be modified using AutoCAD.